Perunding Muhandis logo

Engineering Consultancy
Fee Calculator

Perunding Muhandis · BEM Scale of Fees format
REF  SOF‑CALC‑001
REV  A · MY
Before you rely on this: BEM's actual Scale of Fees percentage tables (by cost band and Type A/B/C works) are a gazetted legal document, and the figures below are placeholder samples, not the real published rates. Open "Rate table" below and enter the exact percentages from your copy of the SOF 1998 / SOF (Rev. 2003), or the new scale once BEM's ongoing revision is gazetted — then this calculator will apply them correctly. Your edits are just kept in this browser tab, not saved anywhere.

01 Project details

Type A Civil & structural (non-building), mechanical, electrical (non-building systems)
Type B Structural engineering in buildings > 4 storeys
Type C M&E engineering systems in buildings > 4 storeys
Total professional fee
RM 0
Applied rate
0.00%
on RM 0

03 Where this cost sits on the scale

RM 0 RM 0

The scale is degressive — the percentage rate steps down as the cost of works increases, then is interpolated between the two nearest points you've defined in the rate table.

04 Rate table — Type A

Cost of works (RM) against fee percentage (%) at that cost. Add rows for every break-point in your gazetted table. Values in between are linearly interpolated.

Cost of works (RM)Fee rate (%)

05 Fee breakdown by stage

Adjust the proportion of the total fee payable at each stage to match your SOF copy or your engagement letter. Must total 100%.

StageShareAmount (RM)
Total100%RM 0